Astaldi

Montreal's Hotelier School

Published in Education


Construction of new school for hotel industry trades in Montreal in the Calixa-Lavallee Centre. The 2 storey building is a steel structure constructed on piles on a structural slab. The surface area of the school is 5,125 sq.m. With the more spacious area, the school will be able to host a greater number of national and international visitors. Construction included 4 modern fully equiped kitchens, 20 cold rooms, a butcher shop, a Gourmet shop for sale of food prepared by students, a restaurant open to the public, hotel rooms, class rooms and administrative offices.


Client
Commission scolaire de la Pointe-de-l'Île

Location
4500, Henri-Bourassa Blvd. East, Montreal

Completion
2009