Maisonneuve College - Pavillion E

Published in Education , LEED


Construction of an autonomous 4-storey building with a concrete structure connected to existing building through a basement with an envelope of masonry resembling the existing.  The new building is composed of a reinforced steel concrete structure on piles.  The building has 5 levels with an elevator and houses dry classrooms. The surface area is 3,430 sq. m. A mechanical room is built at basement level and 7 geothermal shafts are dug on the adjacent lot. The mechanical equipment is comprised of 25 thermopumps and an air treatment unit with a thermal wheel. The project aims for LEED certification NC 1.0. The work includes replacement of windows and glass walls in the existing building in Block D.

Client
De Maisonneuve College

Location
3800, Sherbrooke East, Montreal

Mandate
General contractor

Completion
2011