Astaldi

Jean Claude Malépart Centre Interior Swimming Pool

Published in LEED , Recreation

Remediation of soil and construction of interior swimming pool for Jean Claude Malépart Centre. A system of ground support was implemented at the limits of decontamination work. Measures to protect trees were put in place. The decontamination and remediation of the soil, the construction of an extension to hold two pool basins ( swimming and wading), auxiliary spaces ( lockers, deposit boxes, reception) and 2 rooms on the first floor. All the civil work and exterior landscaping was part of our mandate. The Frontenac metro station is located under du Havre Street (facing the construction site), seismic measuring equipment and motion and vibration detectors are installed in the subway station for the duration of the construction work to conform to safety requirements. The project aims for LEED certification.


Client
City of Montreal

Location
2633, Ontario St East, Montreal

Mandate
General contractor

Completion
2010